Zeeco
Controls Engineer
About this role
Zeeco seeks a Controls Engineer to design and develop control systems and instrumentation for industrial burner equipment. You'll create P&ID drawings, control panel specifications, logic diagrams, and coordinate with engineering and sales teams to deliver customer-compliant solutions from their Broken Arrow, Oklahoma facility.
What you'll do
- Review engineering and sales packages to define equipment scope and customer specifications
- Develop P&ID drawings and control panel BOMs including enclosures, relays, timers, and PLCs
- Create ISA data sheets for transmitters, control valves, and instrumentation devices
- Design control panel drawings, schematics, and interconnection diagrams
- Develop logic diagrams for PLCs and DCS systems and prepare cable routing plans
- Inspect and test equipment before shipment; travel domestically and internationally for commissioning support
What they're looking for
- P&ID and schematic drawing development
- PLC and DCS programming logic
- Control panel design and BOM creation
- ISA instrumentation standards knowledge
- Electrical design and power distribution
- Industrial control systems
- Technical documentation and data sheets
- Project coordination across engineering teams
Opens the application — the Jobs AI extension fills it for you. Set up autofill
Opens the official application on the employer’s site. No login required.
Zeeco
Zeeco designs and manufactures combustion equipment, pressure vessels, piping systems, and environmental solutions for the oil, gas, and power sectors. The company is hiring structural, civil, and mechanical engineers, project engineers, and service engineers to design equipment, oversee project execution, and support field installations and troubleshooting.
- Website
- zeeco.com
Likely interview questions
- Walk us through your experience developing P&ID drawings—what tools have you used and what was the complexity level of the systems?
- Describe a project where you coordinated control system designs across multiple engineering disciplines. How did you handle conflicting requirements?