Skip to main content

Relativity Space

Fluids Subassemblies Manufacturing Engineer II

Long Beach, California, United StatesFrom $156kmidAdded 2 days ago

About this role

Relativity Space seeks a Manufacturing Engineer II to own fluids systems hardware development and production for the Terran R rocket. You'll design scalable manufacturing processes, establish work cells for bending and welding, drive assembly planning, and optimize production systems while collaborating closely with design and test teams.

What you'll do

  • Develop and stand up bending and welding work cells for AeonR and TerranR programs
  • Lead design for manufacturability reviews and assembly sequencing for first builds
  • Conceptualize, source, and implement innovative tooling solutions
  • Establish standard practices, troubleshooting guides, and repair procedures
  • Optimize production systems and identify cost reduction opportunities
  • Create material BOMs, work orders, and technical specifications

What they're looking for

  • Manufacturing process design and optimization
  • Tooling design and implementation
  • Design for manufacturability (DFM)
  • Assembly planning and sequencing
  • Bending and welding process knowledge
  • Cost analysis and process improvement
  • Technical documentation and specifications
  • Cross-functional collaboration
Apply with Autofill

Opens the application — the Jobs AI extension fills it for you. Set up autofill

Opens the official application on the employer’s site. No login required.

Relativity Space

Relativity Space develops the Terran R reusable rocket and is hiring engineers to design, manufacture, and launch it. The company seeks Manufacturing Engineers, Launch Integration Engineers, Vehicle Structures Engineers, and Avionics Hardware Engineers to work on critical flight systems, production processes, and launch operations at Cape Canaveral.

View all jobs at Relativity Space

Likely interview questions

  • Describe your experience designing or optimizing bending and welding work cells from concept to production.
  • How have you balanced design intent with manufacturability constraints in a fast-paced environment?